经典牛牛

Yibin construction project "Jiudu Cup" decoration project selection rules
Source: Release date: July 5, 2019 Issued by:



Yibin City Construction project Wine cup ”Awards decorate renovation Detailed rules for project selection   


Chapter one    total    be  


Article 1   To improve me city The overall level of building decoration industry Further encourage and promote Our city Building decoration enterprises strive to create famous and excellent projects, To build a brand, Yibin Municipal People's government's "opinions on the implementation of the city's construction enterprises multiplication plan", Yibin housing construction About printing and distributing the construction project of Yibin City "Jiudu Cup" award evaluation method (Revised Draft) The decoration project of Yibin City will be included in the decoration project "Jiudu Cup" award Special selection detailed rules and regulations.


Chapter two    Selection scope

Section two strip   Selection scope:

one participate in evaluating and selecting Project by stay Yibin City has obtained the construction permit project;

two , single decoration renovation engineering by The total cost is five hundred More than 10000 yuan or Area in three thousand More than square meters New (reconstruction, expansion) public building decoration project

three The following conditions are not included in the selection scope security hidden danger Or air test failed The project of ; not through Completion acceptance and Fire acceptance eligible engineering The project that can not be inspected on site after completion; the project with serious safety, quality or environmental protection accidents in the construction process; the project with malicious arrears of migrant workers' wages or other major social negative impact events;                   

Chapter three Declaration conditions

Section three strip    declare Construction project "Jiudu Cup" award decorate renovation The project shall meet the following conditions:

one The design unit shall have corresponding qualification, and the engineering design shall conform to the national and ministerial architectural decoration renovation Requirements of design standards and specifications;

two Construction enterprises shall have corresponding qualifications, decorate Decoration Engineering Quality up to national and province Department Level acceptance specification Standards;

three . declared architectural decoration The decoration project must comply with the relevant national standards of energy conservation and environmental protection;

4. The declared project can According to the quality evaluation standard of Building Decoration Engineering( DB33/T1077-2011 )According to the appendix of the evaluation standard, the construction unit shall carry out the evaluation A~ appendix F The scoring table makes a self-evaluation item by item, appendix A The supervisor or the owner shall confirm the results and evaluate the total score eighty-five Projects with a score of or above;

five Subcontractor of Decoration Engineering( Signed by the contractor and the general contractor to subcontract contract If it meets the scope of application, it can be declared independently The application materials of the applicant shall be kept in a separate volume;

Chapter four    Application procedures and materials

Section four strip Declaration procedure

one Yibin City Construction project "Jiudu Cup" award decorate renovation engineering The system of forecast should be carried out in two stages;

2、 decorate Decoration construction According to the scope of selection and application conditions, the enterprise shall, In the construction stage, Yibin construction industry Collection by association And fill in "Yibin City" Construction project "Jiudu Cup" Preview report form 》;

3. Construction industry of Yibin City The association is responsible for organizing Inspection at construction stage And comments Trial work Experts were organized to refer to the quality of building decoration engineering Quantity evaluation standard( DB33/T1077-2011 )If the total score of inspection and evaluation meets the quality engineering standard, it can enter the next stage of review;

4. The decoration project has been completed and passed the completion acceptance Fire acceptance After, decoration construction enterprises to association Application for "Jiudu Cup" of Yibin construction project newspaper Books Review after completion organized by Yibin Construction Industry Association Work and make minutes

Section five strip Application materials

one Yibin City Construction project "Jiudu Cup" Application newspaper The book shall be kept in a separate volume, and the cover and declaration column shall be stamped with the official seal of the enterprise. The official seal of the local construction administrative department shall be stamped on the comment column of the local construction administrative department;

1) General catalogue of application materials;

2) Yibin City Construction project "Jiudu Cup" declaration form 》;

three )Copies of relevant certificates of enterprise legal person license, qualification grade certificate, safety production license, Constructor Certificate, safety assessment certificate and construction engineering construction permit (with the official seal of the company);

four Building decoration construction contract (main contract part) Project final accounts Book (can reflect the total cost of the project Part) copy various A copy Affix the official seal of the application unit and the construction unit

five )Project completion acceptance Name and seal of construction unit and construction unit must be complete Affix the official seal of the application unit and the construction unit;

six )Fire acceptance: the project name, acceptance scope, official seal and date of fire acceptance department must be complete, and the conclusion should be qualified (copy) Affix the official seal of the application unit and the construction unit )。 If the rectification suggestions are put forward in the acceptance opinion, the review record shall be kept for the decoration part (if it has been put on record but not randomly inspected, the record inspection record shall be provided);

seven )Inspection and acceptance of indoor environmental quality Prepare the indoor environmental quality test report issued by the corresponding qualified testing agency, with copies Affix the official seal of the application unit and the construction unit;

eight )Issued by the local construction administrative department Supporting documents (including: the project has been completed and accepted for record, no major safety, quality or environmental protection accidents have occurred, no malicious arrears of migrant workers' wages or other major social negative impact events have occurred);

nine )Various projects reference Standard for quality evaluation of Building Decoration Engineering( DB33/T1077-2011 P28 -P43 provide Evaluation related information

ten Project application decorate Construction organization design (brief )、 new Material Science , new process, new equipment A brief description of application and technological innovation;

eleven )In order to change the main body of the building, load-bearing structure and increase the structural load, it is necessary to Approval documents of original design and relevant units;

twelve )The completion plan, elevation and key node drawing of main parts of the project and supporting documents for deepening design and modification; load test and relevant concealed data and frame node diagram of large chandelier installation; dry hanging node diagram of indoor stone wall column surface, pull-out test report and material certificate, inspection report, concealed acceptance record, etc;

thirteen )Material certificate: To be issued Certificate, test report and re test report of main decoration materials within the validity period (copy) Affix the official seal of the applicant

Note: please refer to the following specifications for environmental protection certification of materials: Code for indoor environment inspection and acceptance of Civil Building Decoration Engineering DB33/T1084-2011

The above information is in accordance with the construction project of Yibin City Wine cup Uniform template format of award declaration A4 The paper and soft cover are arranged into a volume Construction project Wine cup The application form shall be bound neatly in duplicate.

fourteen )Electronic documents (recommended submission U Disk);

Folder 1: declaration form;

Folder 2: Units LOGO Contact information of the company (including: ① contact person, ② contact number, ③ contact address); brief introduction of the enterprise (including enterprise qualification, certification, etc.) one hundred Words);

Folder 3: ① As built plan, elevation and key node drawing of main parts of the project and supporting documents for deepening design and modification( 2-5 Zhang). ② Engineering PPT (for project review, the inspected unit introduces the declared items to the expert group). The contents shall include: the overall picture of the project, the necessary data and pictures, the scope of application, the main functional parts after the completion of the project, the structural conditions in the project construction, the hidden construction pictures in the process of toilet waterproof, assembly construction, pipeline laying, etc., and the introduction of the quality level of indoor decoration, as well as the measures reflecting the main construction methods and reflecting the new technology, new process, new materials and new equipment Innovation points and promotion points in other aspects

Section five chapter    Review procedure and discipline

Section six strip conformity assessment procedure

one , by Construction industry of Yibin City association Organization Review expert group Preliminary examination of application materials And review

two Review and application team Meet the requirements Decoration of renovation The project shall be rechecked on site Check some necessary documents, project quality assurance documents and drawings of key parts, And consult users and relevant departments, and compare with the sub index review

one )Change the main body of the building, load-bearing structure and increase the structural load( two )Indoor stone wall column surface dry hang, dry paste technology( three )Load test and relevant hidden data of large chandelier installation( four )Stair handrails, railings and balustrades( five )Safety glass: install glass on top and wall( six )Deformation joint( seven )Installation works related to decoration works( eight )Whether there is bare line phenomenon or use in part of the fireproof coating brushing in the ceiling PVC Pipe condition; whether rigid reverse support is provided for the super long suspender; whether the keel spacing meets the specification requirements. Whether there are mixed Suspenders for electrical equipment and lines; whether the fire compartment in the ceiling is in place;

three After the project review is completed, it shall be filled in by the review team《 Yibin construction project "Jiudu Cup" review checklist, draw out the recommended review list of the inspected projects, and submit it to the review committee.

four The evaluation shall be presided over by the chairman. The review team leader shall report the general situation of the project, the overall quality evaluation and recommendations, and answer the questions raised by the judges. More than two-thirds of the members who want to win the prize will be reviewed and approved by the jury. (for the evaluation organization, please refer to the construction project of Yibin City "Jiudu Cup" award evaluation method (Revised Version)

five After submitting the certification documents issued by the local construction administrative department (including: completed acceptance record, no major safety, quality or environmental protection accidents, no malicious arrears of migrant workers' wages or other major social negative impact events), the project listed in the award list shall be publicized in the news media, widely solicit opinions and accept supervision The time is seven days. After publicity, the list of winners shall be submitted to the Municipal Bureau of housing and urban rural development for approval.

Section seven strip    Review discipline

 1 Declaration Submitted by the unit Materials must be practical and realistic, and no falsification is allowed. For violators take Undo its newspaper Qualification The seriousness of the plot Of Warn and criticize And inform

 2 The reviewers must be impartial, honest and self disciplined. The violators shall be criticized and warned according to the seriousness of the case, until their qualification as judges is revoked

Section six chapter    Rewards and others

Section eight strip Construction industry of Yibin City Association "Jiudu Cup" award decorate renovation Engineering construction The unit awards the honorary certificate and the prize Encourage And in the industry notification of commendation. At the same time, following the principle of high quality and good price, it is suggested that the construction unit should give appropriate rewards to the winning units, so as to enhance the enthusiasm of construction enterprises to create excellence and win the cup;

Section nine strip    book detailed rules and regulations from Construction industry of Yibin City The association is responsible for the explanation.


Member style MEMBER WONDERFUL >>More

Copyright reserved: Yibin Construction Industry Association

Shuicp no.12011801-1 | design and maintenance: Yibin website construction Beidou network

Contact address: No.6, Luyin Road, Nan'an, Cuiping District, Yibin City, Sichuan Province contact person: Li Ping, Xu Liang, Tel: 0831-2106296 e-mail: 18283778 @ qq.com; 360433917 @ qq.com